Building near sewer and stormwater mains in Canberra

If a sewer or stormwater main runs through your block, Icon Water's approval comes before building work starts, and footings can't go inside its pipe protection envelope. We design footings, piers and beams that keep the load off the pipe.

  • From $790 + GST ($869 inc GST), fixed before we start
  • Fixed quote in under 20 minutes on average, during business hours
  • Engineering only, nothing to sell you
Sewer maintenance hole lid in a backyard lawn beside a trench and pegs for new footings

Get a fixed quote for work near a main

Your plans, a photo of the maintenance hole or pipe marker, and any service or drainage plans you have.

We reply with a fixed quote in under 20 minutes on average, during business hours.

Prefer to talk? Call 02 6189 9876

Or email info@canberrastructuralengineers.com.au

Monday to Friday, 8:00am to 5:00pm

In short

Footing design near a sewer or stormwater main in Canberra starts from $790 + GST ($869 inc GST), and so does a stormwater plan. Icon Water says its approval is needed before building work near its pipes, and footings aren't permitted inside its pipe protection envelope. We design footings, piers or bridging beams that keep loads out of it. Same price across Canberra, Queanbeyan, Jerrabomberra and Googong.

Fee
From $790 + GST ($869 inc GST)
Quote
Fixed, in under 20 minutes on average, during business hours
You receive
Footing drawings and calculations for Icon Water and your certifier
Also covered
Stormwater plans, from the same starting price
What to send
Your plans and any service or drainage plans you have
Area
Canberra, Queanbeyan, Jerrabomberra and Googong, same price

Can I build near a sewer main in Canberra?

Usually, with the right footings and Icon Water's approval. What you can't do is put footings, or a permanent heavy structure, inside the pipe's protection envelope.

Icon Water says its approval is needed before building work starts near its assets, even where the work needs no ACT planning approval. So a DA-exempt carport or deck still goes to Icon Water if it sits close to a main.

Two terms come up in Icon Water's requirements. The zone of influence is the space around a pipe where a structure or construction work can affect it. The pipe protection envelope is, in Icon Water's words, "the controlling requirement in all cases": footings are not permitted within it, and no permanent heavyweight structure is to be built within an easement or the envelope.

We don't quote clearance distances from memory. Icon Water's requirements for your pipe set them, and we design to those. Our guide to building near a sewer in Canberra explains the terms in more detail, and Icon Water's website has its current requirements.

Easements and the DA exemption

Work in an easement or a utility protection space isn't DA-exempt unless the utility gives written permission. The same goes for work that interferes with plumbing and drainage clearances. Check this before you assume a small job needs no development approval.

How do you design footings near a sewer main?

By keeping the building's load out of the pipe protection envelope. That usually means deeper footings, footings moved back, or a beam that spans across the pipe.

ApproachHow it keeps the pipe clearWhere it suits
Deeper footings or piersCarries the load down past the envelope, so the pipe doesn't take itExtensions and granny flats beside a main
Footings set backMoves the footing line out of the envelope, with the structure spanning or cantilevering to itCarports, pergolas and decks
Bridging beamSpans across the line of the pipe between footings on either sideA wall or slab edge that has to cross a main

The drawings show where the pipe is and how the footings stay clear of it, for Icon Water and for your certifier.

Building over a private drain on your own block is a separate rule. Under the ACT Appendix to the building code (Part G10), the part of the drain you build over, or restrict access to, must be tested for soundness to AS/NZS 3500.2 section 15 and made sound first.

Light steel frame for a secondary dwelling on a new slab in a suburban backyard
Figure 1Granny flats, extensions, carports and pools are the jobs that usually meet a main. The footing design is settled before the slab is poured.

Which jobs usually meet a sewer or stormwater main?

Anything that adds footings in the back or side yard: granny flats, extensions, carports, decks and pools.

If you have a sewer or stormwater tie search, or other service and drainage plans, send them with your request. We work from what you have, and your fixed quote says if we need to visit to confirm it on site.

Do I need a rainwater tank for a new home or extension in the ACT?

Often, for a DA-exempt single dwelling. The tank controls apply to a new dwelling, an extension of more than 50% of the existing floor area, or work that adds new plumbing.

Block sizeMinimum tankRoof connected to it
Compact blockNo minimum tankNot set
Mid-sized block2,000 L50% of the roof or 75 m²
Large block, up to 800 m²4,000 L50% of the roof or 100 m²
Large block, over 800 m²5,000 L50% of the roof or 125 m²

Option A of control 17 in the ACT's single dwelling exempt development controls (NI2025-492). The tank must supply at least one toilet, the laundry cold water and all external taps. Option B (greywater) and Option C (a 40% saving in mains water) are alternatives. Your designer or certifier confirms which applies to your block.

A full tank is heavy. When the tank, its slab or its stand sits near a main or on a slope, we include it in the footing design so it doesn't load the pipe.

What's included?

Footing design near a main, or a stormwater plan, from $790 + GST ($869 inc GST): calculations and drawings your certifier, your builder and Icon Water can use. Your fixed quote says if a site visit is needed.

What you getWhat we need from you
Footing, pier or beam design that keeps loads out of the pipe protection envelopeYour house, extension or outbuilding plans
Drawings showing the pipe and how the footings stay clear of itAny service, drainage or tie search plans you have
A stormwater plan, where your certifier asks for onePhotos of the maintenance hole, pipe markers and the area you'll build on
Calculations for your certifierYour site classification, if the block has one

The starting price covers a typical house job. A deep main, a long span or several structures near the pipe can add to the design, and your fixed quote says so before we start. See all our prices.

We're engineers only. We don't dig, lay pipes or build, and we don't recommend who does, so our advice isn't tied to the build.

What happens next?

You see the price before anything is booked.

  1. Send your plans

    Use the form at the top of this page or our quote page, or email info@canberrastructuralengineers.com.au. Add up to 5 photos or plans.

  2. Get a fixed quote

    We reply with a fixed quote in under 20 minutes on average, during business hours.

  3. Design and drawings

    We design the footings and send drawings for Icon Water and your certifier. When a visit is needed, we cover every district, from Gungahlin to Tuggeranong.

Sewer and stormwater questions

Something else on your mind? Call 02 6189 9876, email info@canberrastructuralengineers.com.au or send photos for a fixed quote.

Can I build over a sewer easement in Canberra?

Not with a permanent heavy structure. Icon Water's requirements say no permanent heavyweight structure is to be built within an easement or pipe protection envelope. Work near the pipe needs Icon Water's approval before it starts.

How far from a sewer main can I build?

Icon Water's requirements for your pipe decide it. We don't quote a distance from memory. We design footings that keep the load out of the pipe protection envelope and show that on the drawings.

Do I need Icon Water approval if my work is DA-exempt?

Yes, Icon Water says so. Its approval is needed before building work starts, even where no ACT planning approval is required. Work in an easement also loses its DA exemption without the utility's written permission.

Do you draw stormwater plans?

Yes. A stormwater plan is from $790 + GST ($869 inc GST), the same starting price as footing design near a main.

Do I need a sewer tie search before you start?

It helps, but it isn't essential. We work from the service and drainage plans you have, and your fixed quote says if we need to visit to confirm what we can see on site.